Automobile Engineering
2. Knocking fuel engine and diesel engine
Verified
Automobile Engineering
Tire of Porsche 911 turboTM
A model of Porsche 911 turboTM uses the following tires.
Determine and compare hr, and D for the front and rear tires.
front : 235/35ZR19rear : 305/30ZR19
Read More
Automobile Engineering
For the crank-slider linkage shown shown on the next page with the corresponding nominclature set up the matrix equations to determine the unknown pin forces in x-, y-components and the unknown torque required to drive the system. For matrices other than the unknown forces, only one numeric value should be in each matrix location. Do not solve matrix equations.
following is given fp1 is an external force applied at the center of gravity of link 3 FP is an applied force at the center of gravity of the slider
Read More
Automobile Engineering
The input to the gear train shown below is 600 lb-ft at 500 RPM CW. The numbers on the gears indicate number of teeth.
a. What is the input horsepower?
b. What is the output speed and direction?
c. What is the output horsepower if the efficiency of the gear train is 92%?
d. What is the output torque at this efficiency?
Read More
Automobile Engineering
Using s,v,a,j diagrams, determine if the polynomial listed below results in a satisfactory cam design. You must state the reason and show work to support your answer.
s=C_{0}+C_{1}(\theta / \beta)+C_{2}(\theta / \beta)^{2}
Where Co, C1, C2 and B are constants. At the end of the low dwell, s = 0 and0 = 0 and at the beginning of the high dwell s = h and 0 =B.
Read More
Automobile Engineering
A manufacturing industry using 50 servicingequipment similar to the equipment presented infigure 1. The servicing equipment is composed of fivesubsystems. The estimated reliability for eachsubsystem is:
Subsystem A is 0.99
Subsystem B is 0.81
Subsystem C is 0.75
Subsystem D is 0.98
Subsystem E is 0.90
To estimate the related Annual Maintenance Cost,the servicing equipment have been tested. The record of breakdowns during the testing period is presented in the table below:
Annualized Maintenance Cost by 30%. So, they decide to contract out the preventive maintenance to a service company SERVISCO. The contract will include fixed fees of 50 KD and the cost of:
- Labor: 30Kd
Consumables: 5KD
Before signing the contract, the manufacturer performed a trial period with SERVISCO company,the new record of breakdowns presented by this company is shown below:
1-Calculate the system reliability
2-Calculate the corrective maintenance cost per month
3-Calculate the new maintenance cost if the plant will contract out the preventive maintenance service
4-Calculate the expected Annualized Maintenance Cost before and after contracting the maintenance service
5-Give the expected annual savings in maintenance cost
6-Will the firm contract out the preventive maintenance service with this company? To answer this question , you have to calculate the targeted budget.
Read More
Automobile Engineering
During the diagnosis of hacksaws blades failures, a company gave the following records:
-10 hacksaws tested
-200 hours of testing
-3 hacksaws blades failed halfway through testing
1-The Failure Rate per unit hour
2-The Mean Time Between Failures
3-The expected time to repair the hacksaws, is30 minutes each. Calculate the Time To Failure
Read More
Automobile Engineering
3. Turbo Garger
Read More
Automobile Engineering
2. Knocking fuel engine and diesel engine
Read More
Getting answers to your urgent problems is simple. Submit your query in the given box and get answers Instantly.
Success
Assignment is successfully created
Get Homework Help Now!
Success
Assignment is successfully created
Error
Please add files or description to proceed