system is to be reinforced by two lines each of reactance j4 2 connecting together the two substations as shown in Figure 2(b). Calculate the new fault level at A and B substations in GVA. Neglect resistance. Use Only Zbus Figure 2 A !! Li 1000 (a) (b)
Fig: 1