constructing for the project? C.What are the lengths of the temporary casings used in this project? d. What is the purpose of a temporary casing? е.What is the type (name) of the slurry used to keep the hole open in this project? f.What is the name of the tool used to clean the bottom of the hole before a rebar cage is inserted? What is the name of the narrow pine Used to pour the concrete into the hole?
Fig: 1
Fig: 2
Fig: 3
Fig: 4
Fig: 5
Fig: 6
Fig: 7
Fig: 8