Q6 # Video 5 How many stories will the proposed structure have? b. What is the approximate diameter of the piles theyareconstructing for the project? What are the lengths of

the temporary casings used in this project? What is the purpose of a temporary casing? What is the type (name) of the slurry used to keep the hole open in this project? What is the name of the tool used to clean the bottom of the hole before a rebar cage isinserted? What is the name of the narrow pipe used to pour the concrete into the hole? What is the name of the narrow pipe used to pour the concrete into the hole?