Question

rigorously justify its use.

Your work should include the following:

1. (a) Parameterisation and axial pile capacity calculations using the

provided template. You should ensure that your final pile capacities are

sufficient to support the loads applied by the jacket.

2. (b) A list of your necessary assumptions, assessment of limitations

and uncertainty. This should be in the form of a bullet point list with

supporting figures and references if necessary.

3. (c) A sketch of the workflow you would suggest to the client to optimise

the pile design across the windfarm when the full site investigation is

available.

You may assume that:

4. (a) The jacket legs are sufficiently widely spaced such that there are no

interaction effects between their foundations.

5. (b) Any lateral loads or moments can be ignored and vertical axial loading

only drives the design.