Search for question
Question

This assignment aims to utilize a basic planning technique, the WBS, used in planning projects to define a project's scope and begin the construction planning process, identifying and listing the

tasks required to complete the project. The list of activities should roughly relate to what you have specified in your WBS. This assignment should be submitted in a neat, easy-to-understand, and professional format. Assume Oregon State University is planning a new Learning Innovation Center (LInC) building on the OSU campus. The building will provide classroom and office space for OSU faculty and students. You are asked to prepare: 1. A detailed description of the scope of work for the project (work involved, high-level measurements such as total area, volume, or linear feet, and any additional notes on the work performed that you find of interest related to the scope of work) 2. A sketch, a picture, or a Google Street view of the project (remember to cite your sources). 3. A work breakdown structure (WBS) drawing containing at least three sub- division levels to identify the required tasks for the design and construction of the building. Be creative in reporting. 4. A table with the corresponding list of tasks. List the subdivision levels nested as sub- items. (the bottom level of the subdivision of the WBS should list 40 to 50 tasks). Notes: O You can find information about the project at https://fa.oregonstate.edu/project- delivery/learning-innovation-center-linc-classroom-building-project O The task list should be thorough, including any start-up or close-down tasks required for the project The tasks on the bottom level of the WBS should include roughly 40 to 50 tasks. Tasks should be listed in the approximate order they will be executed, though you should NOT begin to schedule the project. Use the WBS proposed structure template available on Canvas as needed and appropriate to select the tasks and draw the WBS. To draw the WBS, use Word, Excel, Visio, PowerPoint, or any other software that works for you. You can also draw the WBS by hand. O O O O