departments are arranged as shown in the diagram below. Develop a classic "From-To"
distance chart for the layout shown. Assume that the each department tooling is located at the
"X" in each of the department areas.
i.
ii.
iii.
Product
20
1
2
3
4
A
E
x
65"
Routing
A-B-C-D-E
A-D-E
A-B-C-E
A-C-D-E
B
X
100 feet-
25
X
10'
(b) There are 4 products produced at the APEX facility. Routing and forecasting information
is shown in the chart below.
Batch Size
50
17
50
50
50
X
25'
OP
50
10'
100 feet
Production Forecast
(Units/week)
200
900
400
650
Create a "From-To" Chart that shows the number of material handling trips/week
between departments.
Given that the cost to transport items is $2 per foot, create a "From-To" chart showing
material handling cost/week between departments.
Create an AR for APEX based on the material handling cost from the chart developed
in ii above. Use the standard A,E,I,O,U for AR charts
Fig: 1