800 gpd/ft?? 1. Consider a circular sedimentation basin with a depth of 10 ft, an inner radius of 3 ft, and an outer radius of 25 ft. o Calculate the weir loading rate for the maximum flow condition (the one that corresponds with an overflow rate of 800 gpd/ft. o Will the detention time stay above 4 hours at these flow rates?
Fig: 1
Fig: 2
Fig: 3
Fig: 4