operation is 3.23 min. In addition, an irregular work element whose normal time
is 1:25 min must be performed every 5 cycles. The PFD allowance factor is 15%.
Determine
(a) the standard time
(b) how many work units are produced if the worker's performance in an 8-hour
shift is standard.
2. Determine the anticipated amount of time lost per 8-hour shift when an
allowance factor of 15% is used, as in the previous question.
3. Now that the standard is set (T= 4.00 min) and given the data from the previous
questions how many work units would be produced if the worker's average
performance during an 8-hour shift were 125% and the hours worked were
exactly 6.956 hour, which corresponds to the 15% allowance factor.
Fig: 1