Question

12) Using the expected return from Question 11, re-evaluate Question 6 in Project 1: what is your optimal risky (tangency) portfolio now? Why do you think it changed the way it

did? (Note: do not worry about getting low Sharpe ratios here, these are monthly values and need to be multiplied by SQRT (12) to get annualized values.)

Fig: 1