pore water pressure, and effective stress at the midpoint of Layer C for each case. a) (15 pts) The maximum cut will remove 8 feet of the existing soil material. b) (15 pts) The maximum fill will be 6 feet high. The fill soil has a compacted moist unitweight (y) of 120 pcf.
Fig: 1
Fig: 2
Fig: 3