3. (2 Points) When a contractor performs a detailed cost estimate, they usually assign specific
CSI Divisions to each estimator. What are CSI Divisions and list five (5) examples (out of
the 50).
4. (1 Point) What is the relative accuracy of a conceptual (sf) estimate and when is it used?