for the lossy ground. You can use a value for the conductivity 10-03 ≤ ≤ 12 × 10-03
Siemens/meter, and, the relative permittivity as & = 15; the permeability is Mo = 4π X
10-07 Henries/meter. (These are the data one needs to enter when using the Sommerfeld ground
option in FEKO.) Repeat the results of part 1 using the lossy ground option and compare your
results in part 3 against the ones obtained in parts 1 and 2.
Fig: 1