325 an overpass is being built over the pvi of an existing equal tange
Search for question
Question
3.25 An overpass is being built over the PVI of an existing equal-tangent sag curve. The sag curve has a 70-mi/h design speed and G, = -5%, G, = +3%.Determine
the minimum necessary clearance height of the overpass and the resultant elevation of the bottom of the overpass over the PVI. (Ignore the cross-sectional width of the overpass.)