Question

6.19. A 6-ac basin is to be developed into 2 ac of commercial development(C 0,95) and 4 ac of park (C 0.2), as sketched in Figure P6-19 . Using the

tabulated IDF information, what should be the design flow at the inlet?

Fig: 1

Fig: 2