information: Hydraulic retention time = 90 minutes (based on peak flow) Hydraulic loading rate = 800 gpd/ft² (based on peak flow) Weir loading rate = 18,000 gpd/ft Number of tanks = 10 (in parallel) Length : width=7:1
Fig: 1
Fig: 2
Fig: 3
Fig: 4
Fig: 5
Fig: 6