Subsystem A is 0.99 Subsystem B is 0.81 Subsystem C is 0.75 Subsystem D is 0.98 Subsystem E is 0.90 To estimate the related Annual Maintenance Cost, the servicing equipment have been tested. The record of breakdowns during the testing period is presented in the table below: The average cost of breakdown is estimated to 200KD. The manufacturer target is to improve the Annualized Maintenance Cost by 30%. So, they decide to contract out the preventive maintenance to a service company SERVISCO. The contract will include fixed fees of 50 KD and the cost of: Labor: 30KD Consumables: 5KD Before signing the contract, the manufacturer performed a trial period with SERVISCO company, the new record of breakdowns presented by this company is shown below: 1-Calculate the system reliability 2-Calculate the corrective maintenance cost per month 3-Calculate the new maintenance cost if the plant will contract out the preventive maintenance service 4-Calculate the expected Annualized Maintenance Cost before and after contracting the maintenance service Give the expected annual savings in maintenance cost 6-Will the firm contract out the preventive maintenance service with this company? To answer this question, you have to calculate the targeted budget.
Fig: 1
Fig: 2
Fig: 3
Fig: 4
Fig: 5
Fig: 6
Fig: 7
Fig: 8
Fig: 9
Fig: 10
Fig: 11
Fig: 12
Fig: 13
Fig: 14
Fig: 15
Fig: 16
Fig: 17
Fig: 18
Fig: 19
Fig: 20
Fig: 21
Fig: 22