ALASALA
FINAL PROJECT:
BUDGETING
College of Engineering
Prepared b 1
2
3
B
5
2
0.91
10,52
2.04
3.55
0.98
0.78
3.06
1.29
1.05
3.82-
0.61-1.50 -0.49
Reception
Living Room
Bed Room
(В
-1.62
-3.82
10.62
B
-3.00
-3.39
Bath Room
C
-1-1.50 -1.58
-3.00
10.62
-3.06
3.11
Entrance
Kitchen
Bed Room
ARCHITECTURAL PLAN
D
1.50-0.6
-3.06
2.16
0.91
1.50
9.92
3.55
10
3.06
1
2
3
B
4
5
Procedure
1- Knowing that the height of the floor is 3 meters, calculate the following:
a. Number of blooks required to make this floor
b. Doors
c. Windows
2- List all the materials in one table named bill of material (BOM) and the
quantities and the specifications.
3- Give a rough per unit quotation of each material.
4- Give a rough quotation of the labor cost for building this floor Report components
This is a report not a presentation
Introduction
In the introduction explain what budgeting is and describe the floor you are
doing budgeting to.
Methodology
Explain how you got the quantities and the specification of the materials
Results
List all the quantities and the prices