Question

الأصالة ALASALA FINAL PROJECT: BUDGETING College of Engineering Prepared b 1 2 3 B 5 2 0.91 10,52 2.04 3.55 0.98 0.78 3.06 1.29 1.05 3.82- 0.61-1.50 -0.49 Reception Living

Room Bed Room (В -1.62 -3.82 10.62 B -3.00 -3.39 Bath Room C -1-1.50 -1.58 -3.00 10.62 -3.06 3.11 Entrance Kitchen Bed Room ARCHITECTURAL PLAN D 1.50-0.6 -3.06 2.16 0.91 1.50 9.92 3.55 10 3.06 1 2 3 B 4 5 Procedure 1- Knowing that the height of the floor is 3 meters, calculate the following: a. Number of blooks required to make this floor b. Doors c. Windows 2- List all the materials in one table named bill of material (BOM) and the quantities and the specifications. 3- Give a rough per unit quotation of each material. 4- Give a rough quotation of the labor cost for building this floor Report components This is a report not a presentation Introduction In the introduction explain what budgeting is and describe the floor you are doing budgeting to. Methodology Explain how you got the quantities and the specification of the materials Results List all the quantities and the prices

Fig: 1