Search for question
Question

الأصالة

ALASALA

FINAL PROJECT:

BUDGETING

College of Engineering

Prepared b 1

2

3

B

5

2

0.91

10,52

2.04

3.55

0.98

0.78

3.06

1.29

1.05

3.82-

0.61-1.50 -0.49

Reception

Living Room

Bed Room

-1.62

-3.82

10.62

B

-3.00

-3.39

Bath Room

C

-1-1.50 -1.58

-3.00

10.62

-3.06

3.11

Entrance

Kitchen

Bed Room

ARCHITECTURAL PLAN

D

1.50-0.6

-3.06

2.16

0.91

1.50

9.92

3.55

10

3.06

1

2

3

B

4

5

Procedure

1- Knowing that the height of the floor is 3 meters, calculate the following:

a. Number of blooks required to make this floor

b. Doors

c. Windows

2- List all the materials in one table named bill of material (BOM) and the

quantities and the specifications.

3- Give a rough per unit quotation of each material.

4- Give a rough quotation of the labor cost for building this floor Report components

This is a report not a presentation

Introduction

In the introduction explain what budgeting is and describe the floor you are

doing budgeting to.

Methodology

Explain how you got the quantities and the specification of the materials

Results

List all the quantities and the prices