the existing storm drain atthe same invert (i.e. channel bottom) elevation using a gradual, low angle transition section. If the new drain must convey a peak flow of 100 cfs and is to be constructed on the same slope,sketch plan view and specify an appropriate design base width and wall height of the new rectangular storm drain.
Fig: 1