Search for question
Question

Based on the information provided below , make sure to make the PPT of 6 slide in APA referencing style The Scenario: You have contracted with an industrial organization to engineer and write a state air Permit by Rule (PBR) evaluation for a vehicle painting operation facility. According to the local state laws and U.S. Environmental Protection Agency (EPA) laws, the facility must have an air permit before construction begins. Once the facility is completed, the construction air permit will then become the operational air permit for the facility. As a result, your client wants the air permit to automatically align the painting operation facility into operational compliance with state and federal air quality laws. Consequently, it is extremely important for you to evaluate the planned painting operation against the PBR requirements in order to meet the air permit criteria, using the state guidance document and considering the equipment and chemicals already planned for the facility operations. You have tabulated the following information from what you have gleaned from each of the materials' SDS documents and equipment technical data sheets as a plan (each "unit" represents a single vehicle): Interior Liner Coating Material 10 gallons coating/unit 2 gallons of solvent/unit Unit Lining Application Apply interior liners to two (2) units/day Work five (5) hours/day and four (4) days/week Unit Lining Curing Cure interior liners of two (2) units/day Work five (5) hours/day and four (4) days/week Interior Liner Cure Heater fuel source is natural gas-fired drying oven Heater generates 2.1 million (MM) Btu/hr at maximum 2,500 hrs/year Unit Lining Design Cross-draft air plenum Unit interior is the spray area Exhaust Fan 10,000 ft3/min (CFM) 1 exhaust fan Air Makeup Unit 5760 ft3/min (CFM) 1 air makeup system Filter Openings 20.0 ft2 each Two (2) filter openings Coating WV VOC content 2.8 1b/gal coating Coating VM Coating volume 1.0 gal Water Content Per gal/coating 1.0 1b/gal Water Density Per gal/water 8.34 lb/gal Coating VW Water volume Calculation Exempt-solvent Content Per gal/coating 0.5 1b/gal Exempt-solvent Density Per gal/exempt solvent 6.64 lb/gal Coating Ves Exempt solvent volume Calculation Additionally, your state's department of environmental quality (DEQ) has provided you the following PBR limits: Potential to Emit (PTE) 100 tons VOC/year Face Velocity 100 ft/min Filter Velocity 250 ft/min VOC/5-hour period 6.0 lbs/hr Short-term Emissions 1.0 lbs/hr Long-term Emissions 1.0 tons/yr From your first visit with your client, these are your notes and process flow sketch reflecting the intended operational design: · The client has designed an interior coating spray painting system that allows the interior of each unit to be coated. . The operations will involve a stripped-down unit being brought into the facility's shop. · The shop is a steel building with a finished concrete floor and a paint booth for each unit. · The unit will be placed in the spray booth. . The booth will be opened at one end of the booth for makeup air. · The exhaust air will flow through an exhaust chamber at the other end of the unit. · For each unit, once the liner application operations are completed, the forced curing (drying) operations will immediately commence. Booth Exhaust Chamber