Search for question
Question

Engineer A, employed by Firm X, left Firm X and goes to work for Firm Y, a competitor. A project on which Engineer A was in responsible charge was virtually

completed, but Engineer A did not sign or seal the construction documents before leaving Firm X's employment.Engineer B, a principal in Firm X requests Engineer A to sign and seal the drawing. Engineer A refuses to sign or seal the construction documents unless Firm X pays Engineer A an additional fee. a) Write down all the relevant principles keywords related to the above scenario? [1Oorpoints] b) Provide at least four NSPE Code of Ethics References applicable to this scenario. Do not just give number also write the reference quoted? [20 points]

Fig: 1

Fig: 2

Fig: 3