Determine how long it will (should) take to make one part. The components that contribute to total time
include the following:
• Pre-processing
Preparing blanks
Setting up the machine (tools and fixtures). Can be significant on short runs. Drifts into
the background on large runs. Divide setup time over the number of parts per setup run.
Generating CAM and code (?). Could be important if there are customizations, as with
cardholder engraving.
Fixturing-estimate the time required to fix the blank in the machine
Cycle time
De-fixturing-estimate the time to get the part out of the machine
•
• Post-processing
Deburring
Tapping
Polishing/sanding
Cleaning
Inspecting