Question

Manufacturing Planning and Control Assignment 1 Discussion Questions: 1. The discussion of the framework for manufacturing planning and control seems to imply that overall direction setting must be done before detailed

material and capacity planning activities can be accomplished. The latter must be done before executing and controlling the plans is possible. Do you agree? Give an example supporting your position. 2. Apply the MPC framework to a college setting. In particular, Identify the front end, engine, and back end. 3. We have suggested that as changes take place in the world, the MPC system would require modifications to adapt. What changes can you see that will require changes in the MPC system? 4. One of the local company's production managers asked you to advise her on installing an MPC system. She starts by asking you which particular software brand you prefer and if you believe in ERP systems. What questions would you ask her? Quiz Questions: 1. In the MPC process, capacity decisions (equipment, facilities, suppliers, etc.) are most likely to occur in what time horizon? 2. In the MPC process, detailed scheduling decisions are most likely to occur in what time horizon? 3. Master Production Scheduling (MPS) and Resource Planning are a part of which MPC phase? 4. Measurement and Control are a part of which MPC phase? 5. Products that are part of a one-time production process (e.g., bridges or aircraft carriers) would most likely use which form of MPC?

Fig: 1