Question

Preliminary Design of Londiani Dam Hydropower Plant. Assuming the Londiani Dam will provide sufficient water year round. Use the map provided and determine: 2) Flow speed (how much water comes

down the pipe) 1) The head (the vertical drop between your intake point and the turbine location for power generation) 3) Pipeline (penstock) length and diameter