Problem 3 (5 Points) Determine the dead load and live load for a typical upper floor in an office building with movable steel partition walls. The ceiling below is a

suspended steel channel system (2 psf) and the floors have a linoleum finish. The floors are 3-in. reinforced concrete. Allowance should be provided for mechanical ducts.