Search for question
Question

Question

An AC source at 60 Hz is supplying 25 kW to a load at a lagging power factor of 0.5. If the rms

voltage of the supply is 4 kV what capacitance is required to be hooked up in parallel to the

load so that the power factor is raised to 0.8 lagging?