Computing In Industrial Engineering

Questions & Answers

Read the article "Time Tells All" by: George Bishop (a copy is posted on Blackboard) and write a 1 paragraph summary of the key points of the article.


1. Little Brownie Bakers, the Girl Scout Cookie Baker, must deliver 300,000 boxes of cookies per month. The shop produces batches of cookies requiring a setup time of 45 minutes for each production batch. Average standard time for each cookie in a batch is 10 seconds, and there is an average of 600 cookies in a batch. Each box has 22 cookies per box. The bakery workforce for the pressing department consists of two workers per press, two supervisors,and one clerical support staff. There are 8 hours worked per day and an average of 21 days per month at one shift per day. a. Determine how many cookie presses are needed to satisfy production requirements for the month. There are 8 hours worked per day and an average of21 days per month at one shift per day. b. Determine the number of workers for the presses, the number of supervisors and the number of clerical support staff that would be needed.


2. The six flavors of Girl Scout Cookies(TM-Thin Mints, SAM-Samoas, Tre-Trefoils, SS-Savannah Smiles, SM - Smores and TT - Toffee Tastic) that do not contain peanuts are processed through a sequence of five operations (1-mixing dough, 2-baking, 3-liquidtoppings, 4-dry toppings, 5-packaging) at one facility. Not all cookies are processed in all operations. TM, which has weekly quantities of 3250 boxes, is processed through operations 1, 2, 3 and 5 in that order. SAM, which has weekly quantities of 2900 boxes, is processed through operations 1, 2, 3, 3 and 5 in that order. Tre, which has weekly quantities of 1900 boxes, are processed through operations 1, 2, and 5 in that order. SS,which has weekly quantities of 950 boxes, is processed through operations 1, 2, 4, and 5 in that order. SM, which has a weekly quantities of 400, is processed through operations 1, 2,and 5 in that order. Finally, TT, weekly quantities of 250 boxes, is processed through 1, 2,and 5 in that order. (a) Draw the network diagram for this work system. (b) Prepare the From -To table for this work system.


No Question Found forComputing In Industrial Engineering

we will make sure available to you as soon as possible.