Search for question
Question

10. A furnace is delivering heat to a steam power plant at a rate of 280 GJ/h. The plant loses 8 GJ/h of heat tothe air from the piping system. The waste heat is rejected to the low reservoir at a rate of 145 GJ/h. What is: a. the net power output? b. the thermal efficiency of the steam plant?

Fig: 1

Fig: 2

Fig: 3