Search for question
Question

3. The channel shown in the Figure is made of unfinished concrete and has a trapezoidal cross section. The average velocity of the flow is to be 8 m/s when the depth is 2m. Determine the required slope. (Hint: Watch “Chapter 10-Trapezoidal.mp4")

Fig: 1

Fig: 2