Question

Cut Station (SF) 0 0 31+00 0 4 2+00 0 5 2+50 64 6 3+00 120 7 4+00 160 8 5+00 317 9 6+00 51 10 6+50 1 0+00 2 0+50 3a) (10 Points) Complete the earthwork calculation sheet below. End- End- Area Area 11 7+00 12 8+00 13 8+50 46 0 0 0 Fill (SF) 0 115 112 54 30 0 0 0 0 6 125 186 332 Volume of Volume of Fill Cut ( ) 0 0 0 0 170 883 681 90 43 0 0 210 78 28 0 0 0 6 576 480 Stripping Stripping Total Cut Fill (BCY) (CCY) 0 0 0 18 0 30 0 44 22 0 0 0 0 0 25 0 26 76 74 60 21 0 0 0 81 69 3b) (2 Points) Is this a Waste or Borrow project? Available Cut 0 0 0 443 809 621 69 43 0 0 Total Fill Required 0 351 100 28 0 0 0 146 657 549 Adjusted Fill (BCY) 0 138 267 390 111 31 0 0 0 6 Sum (BCY) 0 -138 -267 -390 -52 114 63 -120 -730 -610 Ma Ordin (BC 0 -13 -79 -73 -29 51 113 120 108 -25

Fig: 1