CPE 624 - Process Safety and Sustainability: HIRA HW Assignment
Each student will be assigned a processing node to perform a Hazard and Operational
1 of 3 analysis (see the attached excel sheet for your node assignment). In your
s, Identify the node you are performing the HAZOP on, the provided diagram
of the node, the 2 highest priority process parameters (if you cannot identify 2 please
provide an explanation as to why) you are going to be analyzing, and at least 2 deviations
associated with each process parameter. Organize your HAZOP analysis into a table as
presented to you in the HIRA notes below.
Nodes:
Distillation column
•
Continuous Stir Tank Reactor (With cooling jacket)
Reactant A
Reactant B
Coolant inlet
•
Flash Unit
F, XF
Feed
Feed
Preheater
Steam
TC
TT
Product
Coolant outlet
Valve
Flash
at P
bar &
T°C
Vapour
V,y
Flash
Vessel
Liquid
L, x/n CPE 624 - Process Safety and Sustainability: HIRA HW Assignment
Each student will be assigned a processing node to perform a Hazard and Operational
Study (HAZOP) analysis (see the attached excel sheet for your node assignment). In your
HAZOP analysis, Identify the node you are performing the HAZOP on, the provided diagram
of the node, the 2 highest priority process parameters (if you cannot identify 2 please
provide an explanation as to why) you are going to be analyzing, and at least 2 deviations
associated with each process parameter. Organize your HAZOP analysis into a table as
presented to you in the HIRA notes below.
Nodes:
•
Distillation column
8
3
2
16
-1
5
Continuous Stir Tank Reactor (With cooling jacket)
TC
Reactant A
M
TT
Reactant B
Coolant inlet
Product
Coolant outlet •
Flash Unit
F, XF
Feed
Decanter
Feed
Preheater
Feed Stream-
•
Steam
Valve
V1
LC
Decanter
V1
Heat Exchanger
Steam
Feed
PT PC
(TC
Condensate
Product
Flash
at P
bar &
Vapour
тос
Flash
Vessel
V,y
Liquid
L, x
LT
Liquid Products
Solid Products •
Fixed Bed Reactor
Gas out
Liquid
feed
Packed
bed
Air
or gas
inlet
Stripper Unit
Liquid out
(+ solid)
EXHAUST (GAS OUTLET)
FLOW
METER
AIR
STRIPPER
PUMP
FEED TANK
FLOW
METER
AIR
COMPRESSOR
HEATER
COLLECTION TANK