javier is an ie at lobos manufacturing he has been studying process li
Search for question
Question
Javier is an IE at Lobos Manufacturing. He has been studying process line G to determine if an automated system would be preferred to the existing labor-intensive system. If Lobos
wants to earn at least 20%and uses a 15-year planning horizon, which alternative is preferred? Contributed by Paul R. McCright,University of South Florida