Question

LAST SUITE REMAININ 741 sq ft 04:05 Bedroom 1 3.88 x 5.26m 12'9" x 17'3" Ensuite Bathroom C Dining Kitchen Lounge 5.18 x 8.76m 17'0" x 28'9" Bedroom 2 3.56

x 4.62m 11'8" x 15'2" (C. All measurements are approximate and for display purposes only. ability is accepted by either the agency or Box Property Solutions Ltd as to the exact measurements of the rooms ty Solutions Ltd retains the copyright on this plan and allows agents to use it with agreed permission. Copyright 2/n Revit (40%) Individually you are to produce a fully integrated model and associated documentation for the given Design and Access Statement using Revit. Submitted project items will include: External - Both Structural and Architectural components, surrounding site, site plans topographical information Internal - Basic layout, area plans and internal components Relevant model views, sections, annotations to adequately communicate the building design intent and to show the model to good effect. Grading relate to complexity, accuracy, correct modelling techniques and project ownership. PowerPoint presentations will need to be uploaded with the model files. Deadline will be in week 12. Please ensure that all the material (including any presentation material) is organized in folders and compressed into a single file for upload. When submitting your work please zip/compress the folder into a single file and then rename the file in the following format. (discipline, group letter and then the your uob number) e.g.: Civil_YourName_18001223.zip (obviously replace with your name and uob number) I will be marking the submitted version from canvas. ENB4002-B - Civil - Project Expectation Sheet (40%) Site layout / Grids / Elevations / Orientation / Topo Completed Revit model / MEP systems / External modelling / Model views, sections Design options / Schedules and quantities (Area and space planning considerations zones, areas) D3 Othro Drawings (annotation, dimensions and callouts) Green building design considerations Representation of real world Other: Assumptions list and sources Accuracy of model Project knowledge Names: Date: Feedback / Comments: Gp. Weighting: 20% 20% 10% 10% 10% 10% 20%

Fig: 1

Fig: 2