REMAININ
741 sq ft 04:05
Bedroom 1
3.88 x 5.26m
12'9" x 17'3"
Ensuite
Bathroom
C
Dining
Kitchen
Lounge
5.18 x 8.76m
17'0" x 28'9"
Bedroom 2
3.56 x 4.62m
11'8" x 15'2"
(C.
All measurements are approximate and for display purposes only.
ability is accepted by either the agency or Box Property Solutions Ltd as to the exact measurements of the rooms
ty Solutions Ltd retains the copyright on this plan and allows agents to use it with agreed permission. Copyright 2/n Revit (40%)
Individually you are to produce a fully integrated model and associated documentation for
the given Design and Access Statement using Revit.
Submitted project items will include:
External - Both Structural and Architectural components, surrounding site, site plans
topographical information
Internal - Basic layout, area plans and internal components
Relevant model views, sections, annotations to adequately communicate the building
design intent and to show the model to good effect.
Grading relate to complexity, accuracy, correct modelling techniques and project ownership.
PowerPoint presentations will need to be uploaded with the model files. Deadline will be in week
12.
Please ensure that all the material (including any presentation material) is organized in
folders and compressed into a single file for upload.
When submitting your work please zip/compress the folder into a single file and then
rename the file in the following format. (discipline, group letter and then the your uob
number)
e.g.: Civil_YourName_18001223.zip
(obviously replace with your name and uob number)
I will be marking the submitted version from canvas. ENB4002-B - Civil - Project Expectation Sheet (40%)
Site layout / Grids / Elevations / Orientation / Topo
Completed Revit model / MEP systems / External modelling / Model views, sections
Design options / Schedules and quantities (Area and space planning considerations zones,
areas)
D3 Othro Drawings (annotation, dimensions and callouts)
Green building design considerations
Representation of real world
Other:
Assumptions list and sources
Accuracy of model
Project knowledge
Names:
Date:
Feedback / Comments:
Gp. Weighting:
20%
20%
10%
10%
10%
10%
20%