Question
List the different major scopes of work. 1. Installation of Travel lift and concrete approach ramp. (Parts Plan and Section:S-201.00) 2. Steel Piles Removal (17). (Phase Plan sheet: G-108.00) 3. Removal of Shed, Pier, and Timber piles. (Plan And Section-Best Management Practices: G110.00) 4. Install new west floating p