Search for question
Question

/n -5-2024 Timesing Dimension: Squerings Description (as per New Rules of Measurement) Timesing Dimensions Squaring A.B.D UC Size: 203x203x60 kg/m Grid line 5/A-B-C-D-E Height =8035 578035 40.175 6300 18.9 Description (es per New Rules of Measurement): T= 18.9 x 0.033 T=0.6237 T= 40.175x0.060 T= 2.4105 A.B.D UB Size: 356x127x33kg Grid line (C-D)(D-E) Grid line between 1 and 2 (C-D)(D-E) Grid line 2/(-D)(D-E) Length = 5400 Beams Mazzanne Floor General Anangement. Framed members, Framing and Fabrication length over 1.00m but not exceeding 9.com; weight 25-50 kg lm. Beams. UB Size: 356x127x33 kgm Grid line I/A-C Grid line between land 21 (A-C) (A-C) Length = 6300 5400 32.4 Page no.. 3 T=32.4x0.033 T=1.0692 Project name: Drawing No.: Taker Off/QS: Date: Timesing: Dimension Squaring Description (as per New Rules of Measurement) Testing load testing, five Protection test and other test Timesing: Dimensions Squarings Description (as per New Rules of Measurement): Page no. 23 23 Project name: Drawing No.: Taker Off/ QS: Date: Timesing: Dimension: Squaring Description (as per New Rules of Measurement): Timesing: Dimension: Squarings Description (as per New Rules of Measurement): 127.5x2=255 Add 413.6 Surface treatment Paints on site; a.b.d Brown 267.8 255 1.49 है 936.4 1-19 Grey 2.68 Surface treatment Paints on site; abid Brown Grey 3-6 0.94 4.54 17 Gray 17 Surface treatment paint г 300 B200 Gray D=300x2600 B=200x2400 Surface treatment pat Add 600 400 D= 349x2 = 698 1000 T=6 B=125.4x2 = 256.8 B-T-1254-6=119.4 119.4x2=238.8 Add 698 256.8 238.8 1187.6 Surface treatment Paint on site; a.b.d 5.4 Brown - 6.4 Gray है Gray Page no Project name: Drawing No.: Taker Off/QS: Date: Timesing: Dimension: Squaring Description (as per New Rules of Measurement): Surface treatment paints. D= 365x2=710 B=171.5x2=343 T= 7.4 B-T=171.5-7.4. 164.1 164.1 x2=328.2 Add 710 343 328.2 1381.2 Timesing: Dimensions Squarings Surface treatment Paints on site; a.b.d 223 2.2 1.38 Brown & Description (as per New Rules of Measurement)s Surface treatment paint D= 356x2=76 B=171.5x2=343 T= 7.4 B-T=171.5-7.4=164.1 164.1x2=328:2 Add 710 343 328.2 1381.2 Surface treatment paint on site; a. b.d Brown έ 3.58 Gray ३ 8.6 1.38 Gray 79.98€ Gray Gray Surface treatment Paint D = 206.8x2=413:6 B=133.9x2=267.8 T= 6.4 B-T=133.9-6.4 =127.5 Page no. 21 Project name: Drawing No.: faker Off/ QS: Date: Timesing: Dimension: Squaring: Description (as per New Rules of Measurement) Timesing: Dimension: Squaring Add 710 343 328.2 Description (as per New Rules of Measurement): Surface treatment Paints on site; a.b.d Brown 1381.2 ¢ Surface treatment Grey Paints on site; a.b.d 21.6 1.38 Brown 22-98 Grey 59.4 1.38 έ 60.78 Grey ६ Grey Surface treatment paint D=365x2=710 B=171.5x2=343 Surface treatment paint D=355x2-710 B-171.5x2=343 T=74 B-T=171.5-7.4 =164.1 164.1x2=328.2 T= 74 B-T = 171.5-7.4 = 164.1 164.1x2=328.2 Add 710 343 3282 1381.2 Surface treatment Add 710 22.5 343 1-38 3282 7381.2 Page no. 20 Paints on site; a.b.d Brown 23.88 Gray I Gray