Question

Open your previous DWG file.

1.

3.

4.

5.

6.

7.

8.

CMCE 1110 - CONSTRUCTION ENGINEERING DRAWING I

9.

16

CMCE New York City College of Technology

Construction Management & Civil Engineering Technology

AutoCAD Introduction: Elevations

Create a new sheet entitled "A201".

Use the following layers for the corresponding objects:

Layer Name Color Linetype

A_Wall Existing 17

A Anno Text 76

A_Elev_Hidden 87

59

A Elev Pen 01

A Elev Pen 13

56

A Elev-Pen 18

115

A Elev Pen 25 24

A Elev Pen 35

Defpoints

133

white

Creating the Elevations:

Select the Model Tab at the bottom left. Use the First and Second floor plans to align your elevations. Make a copy of

those floor plans and paste elsewhere inside Model space.

Replicate the Elevations digitally as shown on the following pages. Videos are posted on Blackboard depicting:

01 Creating the North Elevation Outline

02 Creating a Window Set

03 Finishing all the Windows

04 Creating Doors on North Elevation

Lineweight

CONTINUOUS DEFAULT

CONTINUOUS DEFAULT

HIDDEN2

DEFAULT

CONTINUOUS DEFAULT

CONTINUOUS DEFAULT

CONTINUOUS DEFAULT

CONTINUOUS DEFAULT

CONTINUOUS DEFAULT

CONTINUOUS DEFAULT

05 Finishing up the North Elevation

06 Starting the South Elevation

07 Finishing the South Elevation

Use

Doors & Door Details

Lettering, Dimensions, Arrows (Leaders)

Hidden Lines

Scale: 1/4" = 1'-0"

Sheet Title: Exterior Elevations

Sheet Number: A201

Window/Glass Streaks

Window Frames & Chimney

House Recessed Areas

House Outline

House Slab on Grade

Viewports

The videos posted show all lines being drawn on the Defpoints layer. Be sure to place lines on appropriate layers -

see above chart for reference. See colored version posted on Blackboard for comparison.

Include all text with leaders.

Place elevations on the title block sheet and update the sheet information. See posted video on Blackboard to create

multiple viewports on a single sheet.

Save file as LastName_A201.pdf. and email to wchang@citytech.cuny.edu before next class. 10.

Command

Line

Move

Trim

Fillet

Copy

Offset

Mirror

Extra Credit: Create the East and West elevations. See Blackboard for elevation examples. Grade on

elevations will replace the lowest grade on any previous assignment during the semester. Same rules apply as

though this were an assigned drawing (-10 points off per week late and -5 points per mistake).

Save

Print

Circle

ROOF

+19-10"

lignLOOR

FIRST FLOOR

16

GRADE

ROOF

19-10

SECOND FLOOR

10:2

Multiline Text

Distance

FIRST FLOOR

+1-6"

GRADE

Dimension Aligned

Leader

1

2

NORTH ELEVATION

1/4" = 1'-0"

SOUTH ELEVATION

1/4" 1'-0"

2-6

4:3" TYP 4:3" TYP

Saves your file.

Plots your layout.

Creates a circle.

N

*2².1*

ALLEE

Definition

Creates a line.

Moves an object.

Trims excess geometry with a given boundary.

Creates a curved corner with a given radius.

Duplicates an object.

Creates a copy parallel to the original.

Creates a mirror image across a line.

Creates multiple lines of text.

Measures distance between two objects.

Creates an aligned linear dimension

Creates an arrow with text field.

APITONG TRIM, AND

SHUTTERS, TYP

31

-VENT CAP

-LEAD COATED

COPPER ROOFING

STUCCO

APITONG TRIM, AND

SHUTTERS, TYP

1

tr

fil

Keyboard Shortcut

CO

of

mi

mtext

dist

qs

Ctrl-P

C

ESHERICK HOUSE

204 SUNRISE LANE

PHILADELPHIA, PA 19118

LOUIS KAHN, 1961

NOTES:

dimaligned

lead

NEW YORK CITY

COLLEGE OF

TECHNOLOGY

DRAWN BY:

PROFESSOR CHANG

DATE: APRIL 16, 2016

SCALE: 1/4" = 1'-0"

EXTERIOR

ELEVATIONS

A201 ROOF

+19'-10"

SECOND FLOOR

+ 10'-2"

FIRST FLOOR

+1'-6"

GRADE

0'-0"

9'-8"

8'-8"

1

10

8'-8"

6 TYP

NORTH ELEVATION

1/4" = 1'-0"

APITONG TRIM, AND

SHUTTERS, TYP. ROOF

+19'-10"

SECOND FLOOR

+ 10'-2"

FIRST FLOOR

+1'-6"

GRADE

0'-0"

9'-8"

8-8"

(2

15¹-10"

12

17

-.9

SOUTH ELEVATION

1/4" = 1'-0"

4"-3" TYP

4-3 TYP

7'-8"

12'-7"

2/19

MM

2" TYP

8'-0%2*

12

A1

VENT CAP

LEAD COATED

COPPER ROOFING

STUCCO

APITONG TRIM, AND

SHUTTERS, TYP.