convert the existing dwellinghouse into a House in Multiple Occupation (HMO), consisting of three bedrooms and a shared living room and kitchen. You are required to compile a report detailing at least three possible solutions for the client. For each solution you should clearly indicate what works are required to the existing building. The report should assess performance requirement B1 of the Building Regulations 2010 only and provide viable solutions that the client might implement. The solutions do not necessarily need to comply with fire strategy guidance, however any deviations from guidance should be supported by a fire engineering assessment. Your report should be no more than 1,500 words (+/- 10%). Plans for the proposed building are provided on the module blackboard. An assignment briefing session was provided on 08/10/2023 and the presentation slides are available on the module blackboard./n