Page 1 of 47 Context:
●
●
●
Tasks:
●
Parameters for the Group Assignment
●
You are to assume the role of a Developer Project Manager for a proposed construc-
tion project. The project can be a residential building, commercial complex, or infra-
structure development. You should define the scope of the chosen project clearly;
If you do not have a suitable construction project to work on, you can use suitable
chapters in Kerzner (2017), e.g. Denver International Airport, to define the project
scope;
Kerzner, H. (2017). Project management: case studies (Fifth). John Wiley & Sons, Inc.
(NUS Library Copy).
You are to develop the PM plan based on the project scope; you can make reasona-
ble assumptions whenever necessary;
You can use the "Project Management Plan" template at the CDC website:
https://www2a.cdc.gov/cdcup/library/templates/default.htm
to customise the template according to your needs;
You should make the PM plan as detailed as you can;
You will also have to develop an 8-10 min video that provides an overview of the PM
plan.
Submission Requirements:
40% of overall score (10% for video; 30% for PM plan);
4-5 members per team;
• You are encouraged
● Under certain circumstances, the lecturer might need to reshuffle students to ensure
that all teams have similar number of members;
PM plan: No word limit, but succinctness is appreciated (submit as .docx file for
checking of word count; e.g. "PM5101 Team 1.docx");
Presentation: submit as .mp4 file (e.g., "PM5101 Team 1.mp4").
Each team submit only ONE word file and ONE presentation (ONE student to submit
on behalf of the team; ensure all team members are identified in the submission
files);
Page 2 of 47 ●
Include declaration in pptx and docx: We declare that all material in this assignment
is our work and does not involve plagiarism;
Criterion
Peer review will be conducted after the submission; marks for each student may be
adjusted based on peer review.
Report Marking Rubrics (30% of course; criteria add up to 100%):
Comprehensivene
ss and level of
detail (30%)
Tailoring of PM
plan (20%)
Authenticity and
practicality (20%)
Structure (10%)
Writing in general,
spelling and
grammar,
formatting (10%)
Peer assessment
(10%)
Criterion
Quality of PM Plan
(4%)
Poor
Lack of detail in PM plan; required
information are missing
Organisation of
presentation (2%)
Clarity of
presentation (2%)
Quality of
presentation
material (2%)
No or minimal tailoring of the PM plan
when compared to the CDC template
The project scope and PM plan are not
practical and authentic
The plan is disorganized and the
information are disjointed
Many errors in spelling, grammar, and
formatting; unclear and lengthy writing;
report is not well-formatted
Group mates consistently gave negative
feedback
Presentation Marking Rubrics (Upon 10%):
Poor
The PM plan, as presented, did
not meet its purpose; seems
disjointed and lack needed
content
Lack clear structure and hard to
follow
Fair
Doesn't help marker understand
the PM plan
Poorly designed
Fair
Good
***
Good
Page 3 of 47
Excellent
All required information are provided with
comprehensive detail
All changes made are suitable and innovative;
significant improvements made to provided
templates; demonstrates clear understanding
of the context and tailored the template
accordingly
The project scope and PM plan are practical
and authentic demonstrating in-depth
knowledge of the industry and project
management
The plan is organized and all sections are
integrated
Very few errors in spelling, grammar, and
formatting; clear and succinct writing;
professional looking report and documents
Group mates consistently gave positive
feedback
Excellent
The PM plan, as presented, meet its
purpose, is well-integrated, and
contains the key information needed
Structured and easy to follow
Helps marker understand the PM plan
Professional looking and well designed
Plagiarism:
All written assignments will have to be submitted via Canvas where Turnitin reports
can be generated prior to submission; Turnltln score higher than 20% will be deemed as an indication of plagiarized assign-
ment;
Plagiarised assignment will not be accepted and will be reported to NUS for discipli-
nary actions.
Page 4 of 47 Contents
Parameters for the Group Assignment....
Table of contents
List of figures..........
List of tables
List of abbreviations...
Chapter 1: Introduction ().
1.1 Overview of the GBT project..
Table of contents
1.1.1 Project Scope
1.1.2 Project Timeline
1.1.3 Significance of the Gotthard Base Tunnel......
1.2 Purpose and objectives of the Project Management Plan
1.2.1 Purpose..
1.2.2 Objectives..
1.3 Identification of key stakeholders.......
1.3.1 Definition of Stakeholders
1.3.2 Key Stakeholders of the GBT.
Chapter 2: Project Overview ()..............
2.1 Background information on the project
2.2 Project goals and objectives
2.2.1 Project goals.............
2.2.2 Project objectives........
Chapter 3: Scope management plan ()
3.1 Introduction ....
3.2 Scope Definition....
3.3 Scope Planning.
3.4 Scope Change Control....…....…..
3.5 Scope Verification and Validation.
3.6 Scope Control........
3.7 Conclusion........
Chapter 4: Schedule management plan ()
4.1 Introduction ................
Page 5 of 47
2
.5
8
9
10
11
11
11
12
13
14
14
14
14
14
14
16
16
18
18
19
21
21
21
21
21
21
21
21
22
22/n.
Description
Each Chapetr 4 Pages
just follow the assignment template
Need to Work On The Folllowing Chapters:
Chapter 6- Quality management plan
Chapter 9 - Risk management plan
Chapter 19- Project life cycle description