You are required to upload your solutions and working out as either a Word, PDF or JPEG file.
A South Australian Industrial Centre has four machines of five different types and operates 40
hours per week. Part-mix ratios, batch quantities, part routings, machines, servers, and
production times are given in the table below for the five-part styles produced in the shop.
Operation sequence for each part style is in the order of station number. Part styles are identified
by letter and stations are identified by number.
Determine:
-) | CFS)
с
F5
205
%
(a) Which station is the bottleneck
(b) Total production rate of all five parts
(c) Production rates of each of the five-part styles
50
T
(d) Utilization of each server at each station
(e) Average utilization of the industrial center
Part style (i)
Part mix P
Batch quantities Qb
Stations (i)
1
2
3
4
F6
61
Y
4
+
Servers Si
1
1
1
2
F7
A
0.2
20
TPA (hr)
0.30
0.23
0.14
0.40
#
F8
B
0.3
20
TPB (hr)
0.20
0.35
0.20
0.28
F9
&
7 V8 A
C
0.4
20
Tpc (hr)
0.18
0.22
0.45
D
0.5
-1-
20
Tpo (hr)
0.12
0.28
0.38
09
F10
(
99
E
0.8
20
TPE (hr)
0.14
0.28
[10 Marks: 2 marks each]
0.48
100
---
)
0
F11
0+
F12
Fig: 1