Special Project #3: Johnson House Concrete Lab
(refer to the handout in the assignments section)
Takeoff the Following Quantities:
1. Concrete Volume (CY) for:
a.
Continuous Footings
b. Pad Footings
7. Reinforcing Bar weight (lbs.) for
Continuous Footings
a.
CY
b. Pad Footings
CY
C.
Concrete Walls (no window openings)
C.
Concrete Walls (no window openings)
CY
d. Slabs on Grade
CY
2024
CY
CY
CY
Total
CY
8.
Total
No. of Anchor Bolts in Walls @ 24" O.C. (add 1
CY
per corner and 1 per "T").
2.
Formwork area (SF) for:
Each
a.
Continuous Footings
b. Pad Footings
CY
9. Sill Plate Length (LF).
LF
C.
Concrete Walls (no window openings)
CY
d. Slabs on Grade
CY
10. No. of Simpson EPB66 Beam Connectors for Concrete Pads
(see detail 2. Sheet A7).
Total
CY
Each
3. Finish Area (SF)
SF
4. Gravel Volume (CY)
5. Vapor Barrier Area (SF)
6. Welded Wire Area (SF)
CY
SF
11. No. of Dowels @ 16" O.C. alternating left and right (add
one per corner and at "Ts"). See details 1, 3, sheet A7.
SF
"Soft"
Weight per
Mass per
Imperial
Metric
unit length
unit length
Nominal
Diameter
Nominal
Diameter
Bar Size
Size
Nominal
Area(in²)
Nominal
Area
(lb/ft)
(kg/m)
(in)
(mm)
(mm²)
#3
#10
0.376
0.561
0.375
9.525
0.11
71
######
#4
#13
0.668
0.996
0.500
12.7
0.2
129
#5
#16
1.043
1.556
0.625
15.875
0.31
200
#6
#19
1.502
2.24
0.750
19.05
0.44
284
#7
#22
2.044
3.049
0.875
22.225
0.6
387
#8
#25
2.67
3.982
1.000
25.4
0.79
509
#9
#29
3.4
5.071
1.128
28.65
1
645
#10
#32
4.303
6.418
1.27
32.26
1.27
819
#11
#36
5.313
7.924
1.41
35.81
1.56
1006
#14
#43
7.65
11.41
1.693
43
2.25
1452
#18
#57
13.6
20.284
2.257
57.33
4
2581
Each