The developer wants to build the subdivision and is willing to redesign the subdivision by

reducing the number of lots.

The developer would like to be able to build the maximum number of lots possible.

Thus, the developer would like to reduce the number of lots to the point where it is

possible to pay a compensation fee.

• If a compensation fee is not possible, then the developer would like to further reduce the

number of lots so that Post-PPE is less than Pre-PPE and thus the subdivision would be

able to be built.

• The developer would like to delete Lot 1 first, then Lot 2, then Lot 3 etc.

• Assume that Lot 1 and Lot 2 each have a driveway that is 150 feet long by 8 feet wide

1. Is it possible to remove lots so that the design meets the compensation fee

requirements? If so, how many lots will have to be removed and what is the

compensation fee?

2. If it is not possible to meet the compensation fee requirements by just deleting lots,

then how many lots must be deleted so that the Post-PPE is less than Pre-PPP (and

therefore the subdivision meets the regulations)?