ending at the utility Grid): O Inverter-disconnect-meter-PV array-battery O PV array-disconnect-inverter-meter-battery O PV array-battery-inverter-disconnect-meter O PV array-battery-meter-inverter-disconnect Question 6 The Installer is responsible for: 1 pts O Inspect PV system for code compliance 1 pts Designing the PV system according to the local and national standards Installing PV system according to the local and national standards O Designing the PV system according to the local and national standards AND Installing PV system according to the local and national standards
Fig: 1