1) The assignment maximum mark is 20, and it worth 10% of the course overall mark.
2) Assignment shall be submitted through the Assignment Section of the course on the
blackboard. Note that there is only ONE attempt available for the assignment submission.
Please completely check your work before submission.
3) Assignment is due on Wednesday Oct 18, 2023 at 11:59 PM.
4) Late submission of the assignment has a penalty of two marks per calendar day.
Submission Requirements:
•The assignment shall be submitted as one pdf file including the cover page, plan of network,
all output tables for nodes and links.
• The Cover Page shall reflect the course name and code (i.e. CIVL3087), the assignment
name, due date, your full name and student number, and your professor's name.
.Read the assignment work information carefully (attached pages).
• Detailed output, calculations if require, explanations, showing units, neat drawing, are the
minimum requirements of the assignment.
• Every item of the requirements has a portion of the total mark. Make sure to respond all the
requirements and provide a complete package. The original provided drawings for WM
assignment Work Information pages must be attached to your submission.
.
• Professional presentation of your work is very important. Computerised output is preferred.
10% of the total mark is for submission of a clean, legible, and organised assignment.
part 1-WM design
1) Draw a WM network plan(choose from proj#1-plans-folder) by software.
2) Review the provided drawings of the project and make yourself familiar with their details.
3) Read/find the information you need for the assignment calculations and design, on the
provided drawings; example length(Based on the scale), and demand for each joints based
on population.(Recommended: Choose EL=100m for all joints, L=100m and C=100 for all
pipes and 2 Lps for random joints)
4) Determine the proper size/diameter of the proposed WM pipes.
5) Print all relevant hydraulic output from software- example: velocity, pressure, Diameter,
6) TIP: Review the examples practiced in the quick start tutorial.
7) Confirm whether the provided diameters of the proposed WM pipe are acceptable (i.e.
explain why/how).
8) Confirm whether a smaller size of the WM pipe sections (i.e. one size smaller) are
acceptable. For this item, you should redo your RUN based on the new/revised sizes,
consider about total head, pressure...
9) The min pressure of network is 1A minutes and C=100(Hazen-Williams). (If someone add
a reservoir to the system, without pump, the total head should be 100+ 1A)-Remember the
RANGE between min and max of joint's pressure never be more than 30m(200kpa)).
10)Add a pump station, or more reservoir to the system if necessary.
"Use the first right side digit of your student number as "A". Example: if your student number is
1234567890, the min pressure of 1A will be 10 m.
Fig: 1