name university of hartford college of engineering technology and arch
Search for question
Question
NAME:
University of Hartford
College of Engineering, Technology, and Architecture
Department of Civil, Environmental & Biomedical Engineering
CE 591 - Applied Wastewater Treatment
Spring Semester 2024
1. (75 pts) You recently graduated and began working for a general contractor. Your company is bidding
on the construction of the Southington Plant upgrade. The estimating department asks for your help
in preparing their bid. They want you to complete a spreadsheet “take-off” of all the pumping,
piping and equipment (valves, gates, meters, instruments, drives, etc.) associated with the
Nitrification Settling Gallery. Also include safety instrumentation. Do not include HVAC equipment,
seal water piping or coagulant piping.
Submit a spreadsheet with your quantity take-off. Most of the information you need is found on
drawings M-403, PI-402, E-403 and in the technical specifications. Include quantities, sizes and
types of fittings (T's, elbows, couplings), valves, pumps, flow meters, instruments, drives, etc.
I have provided a blank spreadsheet for you to complete. You complete columns B-F; I have added
notes to the headings of these columns to help you understand what I'm looking for. You may need
to add rows under some of the item types. You may attach data sheets/schedules from the
specifications with the specific equipment for this area highlighted. If you have any questions,
please ask in class or send me an email.
2. (25 pts) Please write a 1-2 page reflection of what you learned in this course that you think might
benefit you in the future. Try to be specific and provide examples.