Question

For Aspen plus model Need equipment selection and sizing and utilities requirements and design. For the heat exchanger before the reactor, the reactor which is a CSTR reactor, the reverse osmosis

system and the pumps needed for this part (how many pumps needed, size and materials of pumps) Excel file is attached, where energy balane is wrong