For Aspen plus model

Need equipment selection and sizing and utilities

requirements and design.

For the heat exchanger before the reactor, the

reactor which is a CSTR reactor, the reverse

osmosis system and the pumps needed for this part

(how many pumps needed, size and materials of

pumps)

Excel file is attached, where energy balane is

wrong